Case study · Highways and civil engineering

    How J Hopkins Contractors delivered a PPN 006 Carbon Reduction Plan in under 14 days

    J Hopkins needed a fully compliant, audit-ready PPN 006 Carbon Reduction Plan for an urgent National Highways tender. We delivered it in under two weeks, with an assured Scope 1, 2 and 3 baseline behind it.

    PPN 006 CRP delivered in

    Under 14 days

    Client
    J Hopkins (Contractors) Ltd
    Sector
    Highways and civil engineering
    Delivered
    Assured PPN 006 CRP, GHG Protocol aligned
    Tender
    National Highways
    Status
    Complete

    Before Working With The Carbon Stamp

    ✕

    Their previous CRP was based on outdated 2018 data, no longer reflecting their actual operations, fleet, or supply chain emissions.

    ✕

    No assured baseline aligned to the GHG Protocol, making tender responses difficult to evidence.

    ✕

    Limited internal visibility on high-impact Scope 3 categories like asphalt, bitumen and ironwork.

    After Working With The Carbon Stamp

    A complete, GHG-Protocol-aligned baseline covering all material Scope 1, 2 and 3 emissions.

    A fully compliant PPN 006 Carbon Reduction Plan delivered inside 14 days, ready for National Highways tender submission.

    Clear reduction trajectory to 2030, 2035 and 2050, with actionable next steps and supplier-engagement processes.

    "The Carbon Stamp were exceptional. They stepped in at short notice as we had a tender deadline to meet.

    Frazer and his team produced a clear, professional PPN 006 (Previously PPN 06/21) Carbon Reduction Plan just in time for our submission.

    Their expertise and responsiveness were great. Excellent communication throughout made the whole process smooth and stress free.

    Highly recommend."
    Tony BrooksView Tony Brooks on LinkedIn
    Business Development Manager, J Hopkins Contractors

    The Company

    J Hopkins Contractors is a highways maintenance and civil engineering contractor delivering road surfacing, kerb repairs, clean-up works and small-scale civils across the UK. The business employs 19 office staff and almost 100 site operatives, servicing multiple councils and regional contracts.

    As National Highways tightens carbon requirements, J Hopkins recognised the need for accurate, GHG-aligned measurement and a compliant Carbon Reduction Plan to remain competitive in tenders.

    The Challenge

    J Hopkins needed a fully compliant PPN 006 Carbon Reduction Plan under extreme time pressure. They lacked:

    An up-to-date carbon footprint (the previous version was from 2018)
    A assured baseline aligned to the GHG Protocol
    A structured overview of Scope 1, 2 and all relevant Scope 3 categories
    A clear reduction pathway aligned with National Highways Net Zero 2040
    Documentation that met the exact formatting and compliance requirements of PPN 006

    The deadline for their National Highways tender required rapid turnaround without sacrificing accuracy or audit integrity.

    How The Carbon Stamp Helped

    1

    Rapid GHG Assessment Kickoff

    We rebuilt their entire organisational footprint using the GHG Protocol, establishing a robust 2024 baseline across all material emissions sources.

    2

    Data Collection & Analysis

    We completed a fast but thorough data-gathering process covering fleet, plant, asphalt, bitumen, waste, travel, capital goods and all relevant Scope 3 categories. Supplier and procurement records were incorporated to reflect their true operational footprint.

    3

    Tender-Ready PPN 006 CRP

    We produced a complete PPN 006 Carbon Reduction Plan including baseline emissions, targets, reduction trajectory and a clear action plan. The document was structured specifically for National Highways tender submission and delivered in under 14 days.

    Key Benefits Achieved

    BenefitOutcome
    Assured 2024 BaselineFull Scope 1, 2 and 3 footprint mapped to GHG Protocol Corporate Standard.
    Tender-Ready CRPFully compliant Carbon Reduction Plan submitted for National Highways tender within 2 weeks.
    Accurate Scope 3 VisibilityHigh-accuracy breakdown of asphalt, aggregates, ironwork, fleet fuel and upstream logistics.
    Clear Reduction Roadmap30 percent reduction by 2030, 50 percent by 2035, Net Zero by 2050.
    Long-Term StrategyA foundation for year-on-year tracking, supplier engagement and future SECR alignment.

    Looking Ahead

    With an assured footprint and a compliant CRP in place, J Hopkins can now move into long-term carbon management. Planned next steps include:

    Fleet electrification
    Low-carbon materials
    Route optimisation
    Supplier engagement
    Annual tracking

    Their new baseline and CRP now provide a strong competitive advantage in future National Highways tenders.

    J Hopkins Contractors Carbon Impact Report 2025 Title Page
    Carbon Impact Report

    Want a Carbon Impact Report for Your Business?

    Every client receives a comprehensive Carbon Impact Report like this one, covering full Scope 1, 2 & 3 emissions with a practical reduction roadmap.

    GHG Protocol-aligned methodology
    Tender-ready documentation
    Assurance included

    No commitment required, we'll discuss your needs and explain how it works.